Author : Anthony Lo Surdo SC FCIArb - 17-03-2017
The Contract provided for the construction of five warehouses and the laying of various types of pavement. Following the laying of the pavement, cracks and spalling began to develop in some pavement types. Tzaneros claimed from WGC and AMT the cost of replacing the defective pavement.
The Issues
The issues raised by the notice of appeal included:
(1) Whether on a proper construction of the terms of the Deed and the letter of consent from WGC, there was an assignment by P& O to Tzaneros of any accrued cause(s) of action for breach of the building warranties.
(2) Whether construction of the relevant documents by reference to the surrounding circumstances was permissible.
(3) Whether Tzaneros acquired the terminal with knowledge of the defects and therefore suffered no loss as a consequence of those defects.
(4) Whether Tzaneros was entitled to recover damages for the cost of full replacement of the pavement.
(5) Whether a reduction in the sum of damages awarded to Tzaneros for betterment should have been made.
The Findings
The Court held (Bathurst CJ, Beazley P and Gleeson JA agreeing), dismissing the appeal:
Construction


Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019
Anthony Lo Surdo SC FCIArb
Date : 20-08-2019